Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(04), 323-30.

Arditi, D, Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(04), 353-64.

Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study. Construction Management and Economics, 20(04), 365-77.

  • Type: Journal Article
  • Keywords: conflict; attitudinal differences; project management; large projects; factor analysis
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190210133456
  • Abstract:

    Conflicts encountered in large scale construction projects occur in two categories: internal conflicts and interface conflicts. Internal conflicts are experienced among the project participants, whereas interface conflicts are between the construction project and groups outside the project. Many large scale construction projects often experience interface conflicts in the form of conflicting requirements from different social groups. This paper examines the attitudes of five groups of respondents on the factors leading to the interface conflicts experienced on the Yadana Natural Gas Pipeline Project (YNGPP) in Thailand as a case study. The study was conducted through questionnaire surveys of the five groups: the group affected by the project; the project participants; non-government organizations (NGOs) and interested organizations; academics and experts; and local government officials. The results show that these five groups have differences in attitudes towards the factors leading to the interface conflicts encountered on the project; and it is the differences in attitudes that generated the conflicts. The key variables were grouped into main categories and the degree of importance of each key factor leading to the interface conflicts was identified.

Ford, D N, Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(04), 343-51.

Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(04), 315-21.

Shohet, I M, Puterman, M and Gilboa, E (2002) Deterioration patterns of building cladding components for maintenance management. Construction Management and Economics, 20(04), 305-14.

Tay, L and Morgan, N A (2002) Antecedents and consequences of market orientation in chartered surveying firms. Construction Management and Economics, 20(04), 331-41.